Shopping Cart Cart

Tel: 260-482-7544 
Fax: 260-482-7354 
Sales: sales@faztek.net 
Design: design@faztek.net 

Aluminum T-Slot on Blogger Aluminum T-Slot Facebook Aluminum T-Slot LinkedIn Aluminum T-Slot Twitter Aluminum T-Slot Wordpress Aluminum T-Slot YouTube Channel


 Solutions
    Contact Faztek

    New Products

    Applications

    Success Stories

    Services

    Electronic Safety

    Steel Fencing

 Support

    Design Team

    Catalog

    none CAD Files
none
    FrameCreator

    none Tech Data
none
 Other
    Faztek Overstock

    Faz-Store

    EconoFrames     About Faztek     Job Opportunities

On-line Core Faz-Book

Faz-Book:  New Interactive Faztek Catalog

Core Product Offering


On-line Extended Faz-Book

Faz-Book:  New Interactive Faztek Catalog

Extended Product Offering


product catalog
Request Your FREE
Core Product Guide!



Made In USA! USA Flag

 

 

 

 

Material Handling Cart

Overview
Faztek is proud to have played a role in the construction of the Pentagon Memorial, built in remembrance of the lives lost at the Pentagon on September 11, 2001. A unique material handling solution was designed to assist construction workers involved with the project.

Problem/Application
Balfour Beatty Construction employees needed an efficient and cost-effective method of moving 184 precast memorial basins measuring 15.5’ x 2.0’ and weighing 7,000 lbs each. Ground conditions and concrete footings posed a challenge, preventing the use of traditional machinery to position the basins.

Solution
Faztek designed a heavy duty material cart, capable of transporting these basins around the construction site safely and efficiently. Shown here is the cart being used on site. Due to the large size of this project, the cart was sub-assembled in two separate sections to allow for safe shipping.

After receiving the cart, Balfour Beatty Construction simply attached the two sections and was able to start utilizing this cart for handling the heavy basins.

“Our schedule showed us installing an average of 4 basins a day. With the system that Faztek helped us design we have been able to set anywhere between 12 and 15 basins a day” says Superintendent Dave Taft.

Conclusion
“I want to thank everyone at Faztek who had a hand in helping us solve our material handling problem at the Pentagon 9/11 Memorial. Clearly you have talented designers and engineers that are capable of thinking “outside of the box”. I found that anytime I spoke with a Faztek employee they were both enthusiastic about the project, and eager to help.”

Material Handling Cart with Modular Aluminum
 

Material Handling Cart with Modular Aluminum

 

 

 

Home | About Us | On-line Catalog | Downloads | Privacy Policy | Terms | Contact Us | F.A.Q. | Links

5120 Investment Drive, Fort Wayne, IN 46808

Ph: 260.482.7544 * Fx: 260.482.7354 * design@faztek.net * sales@faztek.net

© Copyright Faztek, LLC 2011, All rights reserved.

SEO and Web Design updated by Summit Data 2011